Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
Any professional surveyors here?
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="KOPBET" data-source="post: 3777784" data-attributes="member: 4153"><p>Ok, first question or two.</p><p></p><p>Tulsa County residential. Preparing to have a fence replaced, wanting to be sure the new fence is on the property line as we are going to split the cost with the neighbor. The old fence appears to be all over the line for part of the length and on the neighbor's side for other parts.</p><p></p><p>Front yard has rebar rods (about 4in deep and 11 ft. or so from the curb) at what appears to be correct placement for the parcel front corners. Back yard has 4x4 posts at the back corners of the lot that everyone adjacent to me has attached their wooden fences to. The proper known distance for the back of the parcel appears to be correct on the INSIDE edge of the two corner posts (70.0 ft.)</p><p></p><p>Question surrounds the placement of the 4x4 posts. Is this normal practice to use 4x4 posts as corner markers in place of rebar rods? If so, is the center of the post on the corner of the lot or adjacent to it (in the corner so to speak)? Can I just string a 150 ft. length of line from the post's side or center to the rebar at the opposite end and be accurate enough?</p><p></p><p>I am trying to avoid paying $950 for a boundary survey. Or just not worry about it and put the new fence up where the old one is?</p></blockquote><p></p>
[QUOTE="KOPBET, post: 3777784, member: 4153"] Ok, first question or two. Tulsa County residential. Preparing to have a fence replaced, wanting to be sure the new fence is on the property line as we are going to split the cost with the neighbor. The old fence appears to be all over the line for part of the length and on the neighbor's side for other parts. Front yard has rebar rods (about 4in deep and 11 ft. or so from the curb) at what appears to be correct placement for the parcel front corners. Back yard has 4x4 posts at the back corners of the lot that everyone adjacent to me has attached their wooden fences to. The proper known distance for the back of the parcel appears to be correct on the INSIDE edge of the two corner posts (70.0 ft.) Question surrounds the placement of the 4x4 posts. Is this normal practice to use 4x4 posts as corner markers in place of rebar rods? If so, is the center of the post on the corner of the lot or adjacent to it (in the corner so to speak)? Can I just string a 150 ft. length of line from the post's side or center to the rebar at the opposite end and be accurate enough? I am trying to avoid paying $950 for a boundary survey. Or just not worry about it and put the new fence up where the old one is? [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
Any professional surveyors here?
Search titles only
By:
Top
Bottom