Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
Arizona Company says it can build the entire wall under budget and on time.
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="dennishoddy" data-source="post: 3221896" data-attributes="member: 5412"><p><strong>EMPE (3TV/CBS 5) -</strong> Building the border wall undertime and under budget. Fisher industries, a Tempe company, says it's possible.</p><p></p><p>And it wants to be the one to do it.</p><p></p><p>Border Patrol says it needs 234 miles of new barrier along the southern border. The government estimated doing that could take five years and cost $5.7 billion.</p><p></p><p></p><p><a href="https://www.azfamily.com/archives/tempe-company-in-running-to-build-border-wall-as-president/article_46e3baab-74b8-582b-8fc4-0641d5ae958b.html" target="_blank">Fisher Industries was one of the original companies to build a prototype wall</a> for the government more than a year ago.</p><p></p><p>Now it has sent in a new proposal. It says it can get the job done in 16 months, for $1.4 billion less.</p><p></p><p>Tommy Fisher, the company's president and CEO says it’s possible thanks to the new system they've patented to install the steel bollard fence.</p><p></p><p>The special hanging system attached to an excavator can put in seven panels at a time.</p><p></p><p>With multiple excavators working simultaneously, Fisher says they could complete a mile of fence per day.</p><p></p><p></p><p></p><p>Fisher is calling his plan a "complete border security system."</p><p></p><p>“Which includes the barrier, as well as paved roads for the agents and then the electrical package that has conduit for the future technical devices that the government needs,” he explained.</p><p></p><p>Now Fisher Industries hopes it can win that big government contract.</p><p></p><p>“And the biggest thing is I think you'd have a lot of support from the agents. Because when they go from walking on the ground to riding horseback, four-wheeler, their lives are put in danger somewhat. We give them the upper hand to be more humane, have a roadway to patrol a little bit better,” said Fisher.</p><p></p><p>Soon Fisher Industries is going to demonstrate its technique to government and elected officials to prove how fast it can put in the fence.</p><p></p><p><a href="https://www.azfamily.com/news/tempe-company-says-it-can-build-border-wall-under-budget/article_9e0d7094-4213-11e9-96b5-6b374a0d2470.html" target="_blank">https://www.azfamily.com/news/tempe-company-says-it-can-build-border-wall-under-budget/article_9e0d7094-4213-11e9-96b5-6b374a0d2470.html</a></p></blockquote><p></p>
[QUOTE="dennishoddy, post: 3221896, member: 5412"] [B]EMPE (3TV/CBS 5) -[/B] Building the border wall undertime and under budget. Fisher industries, a Tempe company, says it's possible. And it wants to be the one to do it. Border Patrol says it needs 234 miles of new barrier along the southern border. The government estimated doing that could take five years and cost $5.7 billion. [URL='https://www.azfamily.com/archives/tempe-company-in-running-to-build-border-wall-as-president/article_46e3baab-74b8-582b-8fc4-0641d5ae958b.html']Fisher Industries was one of the original companies to build a prototype wall[/URL] for the government more than a year ago. Now it has sent in a new proposal. It says it can get the job done in 16 months, for $1.4 billion less. Tommy Fisher, the company's president and CEO says it’s possible thanks to the new system they've patented to install the steel bollard fence. The special hanging system attached to an excavator can put in seven panels at a time. With multiple excavators working simultaneously, Fisher says they could complete a mile of fence per day. Fisher is calling his plan a "complete border security system." “Which includes the barrier, as well as paved roads for the agents and then the electrical package that has conduit for the future technical devices that the government needs,” he explained. Now Fisher Industries hopes it can win that big government contract. “And the biggest thing is I think you'd have a lot of support from the agents. Because when they go from walking on the ground to riding horseback, four-wheeler, their lives are put in danger somewhat. We give them the upper hand to be more humane, have a roadway to patrol a little bit better,” said Fisher. Soon Fisher Industries is going to demonstrate its technique to government and elected officials to prove how fast it can put in the fence. [URL]https://www.azfamily.com/news/tempe-company-says-it-can-build-border-wall-under-budget/article_9e0d7094-4213-11e9-96b5-6b374a0d2470.html[/URL] [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
Arizona Company says it can build the entire wall under budget and on time.
Search titles only
By:
Top
Bottom