I know a guy in Bristow that will do the concrete for you. You buy the supplies and order the concrete. Cash and a couple Coronas will get you a fair deal on labor.
 

Redmule454

Sharpshooter
Special Hen
Joined
Apr 23, 2009
Messages
393
Reaction score
59
Location
Rogers Co.
I started out looking at a 30x40 then went to 40x60. I laid out on a drawing what I really needed and ended up buying a 40x75 with a 15x75 lean-to on each side. After the concrete was poured I walked around the slab and thought. "hmmmm....you know this looks small.....should have gone to a 40x80" :-)
I bought a Mueller building and had a contractor they recommended put it up.
The costs of concrete varied from 17K to 52K! So many concrete finishers think they can do the whole project. Buyer beware! The cost to install the building varied from 10K to 32K.
 

Snattlerake

Conservitum Americum
Special Hen
Joined
Jan 19, 2019
Messages
20,658
Reaction score
32,176
Location
OKC
Looking to have a metal shop/garage built. Need everything from the concrete up done. I don’t have the will, want to to tackle it my self. Looking at a 20x30 with two over head doors. Has anyone had this done here lately? Who to use??? i’m in the middle between Tulsa and Stillwater.
Definitely get 240 electric service and you might want to consider a water pipe, gas piping, and a couple of low voltage conduits to the shop for internet/telephone and alarm systems. Put it all in now for future use.
 

BUDMAN-BILL

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
Jun 15, 2005
Messages
4,306
Reaction score
1,364
Location
Drumright, Okla
Definitely get 240 electric service and you might want to consider a water pipe, gas piping, and a couple of low voltage conduits to the shop for internet/telephone and alarm systems. Put it all in now for future use.
Oh, that will be done, I’m knowledgeable in that department. Main water line like is about 25’ away from where I’m gonna build.
 

BUDMAN-BILL

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
Jun 15, 2005
Messages
4,306
Reaction score
1,364
Location
Drumright, Okla
I started out looking at a 30x40 then went to 40x60. I laid out on a drawing what I really needed and ended up buying a 40x75 with a 15x75 lean-to on each side. After the concrete was poured I walked around the slab and thought. "hmmmm....you know this looks small.....should have gone to a 40x80" :-)
I bought a Mueller building and had a contractor they recommended put it up.
The costs of concrete varied from 17K to 52K! So many concrete finishers think they can do the whole project. Buyer beware! The cost to install the building varied from 10K to 32K.
Holly cow, Lol. I’m thinking about a 30x40 now instead of a 20x30. Two over head doors, a walkthrough and two windows. I’ve already laid it out on the ground and think it will be perfect
 

Kid Glock

Sharpshooter
Special Hen
Joined
Sep 2, 2005
Messages
1,965
Reaction score
693
Location
NE Okla.
Ive been considering building another red iron or even a wooden pole barn so please keep us updated on who and what you go with. Needless to say, regardless how big you go, in time it wont be big enough.
 