here's the product needed. i use Foamy lids and 12 gauge Romex, and clear silicon
pre silicon assembly
i liberally fill the inside cup of the lid with silicon after i've pulled the Romex so i see copper on both sides, fill with silicon, pull the Romex down until the insulation stops it, then i have some plastic shelves that have slotted shevles, put the copper end thru one of the slots and hang a small weight to the copper hoop. let it dry, hang it up, attach feeder and fill the lid with water
and in service
pre silicon assembly
i liberally fill the inside cup of the lid with silicon after i've pulled the Romex so i see copper on both sides, fill with silicon, pull the Romex down until the insulation stops it, then i have some plastic shelves that have slotted shevles, put the copper end thru one of the slots and hang a small weight to the copper hoop. let it dry, hang it up, attach feeder and fill the lid with water
and in service
Last edited: