Forums
New posts
Search forums
What's new
New posts
New media
New media comments
Latest activity
Classifieds
Media
New media
New comments
Search media
Log in
Register
What's New?
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More Options
Advertise with us
Contact Us
Close Menu
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Forums
The Water Cooler
General Discussion
Need new 5 ton HVAC system
Search titles only
By:
Reply to Thread
This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Message
<blockquote data-quote="tyromeo55" data-source="post: 3584372" data-attributes="member: 1719"><p>If it was me and you could baby the current unit thru the summer....</p><p></p><p>I'd break it up into smaller projects. </p><p></p><p>1)Get someone to layout what you need and where for ductwork. Get it installed ASAP before it gets too hot (use pre insulated boots)</p><p></p><p>2) this summer try to acquire the furnace and evap coil. Install in fall so it will be in service this following winter season.</p><p></p><p>3) this winter season try to acquire the new condenser and copper (hopefully copper prices are better by then). Install in springtime.</p><p></p><p>4) remove old equipment after the new is up and running</p></blockquote><p></p>
[QUOTE="tyromeo55, post: 3584372, member: 1719"] If it was me and you could baby the current unit thru the summer.... I'd break it up into smaller projects. 1)Get someone to layout what you need and where for ductwork. Get it installed ASAP before it gets too hot (use pre insulated boots) 2) this summer try to acquire the furnace and evap coil. Install in fall so it will be in service this following winter season. 3) this winter season try to acquire the new condenser and copper (hopefully copper prices are better by then). Install in springtime. 4) remove old equipment after the new is up and running [/QUOTE]
Insert Quotes…
Verification
Post Reply
Forums
The Water Cooler
General Discussion
Need new 5 ton HVAC system
Search titles only
By:
Top
Bottom