Cross bracing ideas for carport/shop ???

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

mouthpiece

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
May 15, 2007
Messages
5,354
Reaction score
2,557
Location
Broken Arrow
IMG_4795.jpeg
IMG_4797.jpeg
IMG_4798.jpeg
Sunday one of my boys helped me get metal on the other 1/2 roof. Ran out of screws
 

-Pjackso

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
Jun 25, 2009
Messages
1,098
Reaction score
878
Location
OKC
Awesome pics, and great progress!
Looking good....

BUT - I have concerns about the legs.
I know you welded the pipes to the bottom of the truss so that it'd be taller. (Who wouldn't want a taller shop) But I'm concerned about the pipes.

In short, you have a tall rigid structure (truss system) put on top of small pipes. Any lateral wind load will try to flex the shop - and the pipes (and welds) are what will flex the most. Over years it may fatigue the pipes/welds.

I'm not a shop builder, so I don't know what's generally acceptable for shops this size. Thoughts?

It'll probably be fine, just my passing thoughts.
 

-Pjackso

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
Jun 25, 2009
Messages
1,098
Reaction score
878
Location
OKC
If you're concerned about rigidity (X-bracing) - you can move the shipping containers adjacent (against) the shop walls and weld brackets to attach the containers to the shop.
The containers would provide some lateral/perpendicular rigidity to the building assembly.

If you do this, you could also pour concrete piers and attach the containers to the piers. ...for added foundation strength.
 
Last edited:

-Pjackso

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
Jun 25, 2009
Messages
1,098
Reaction score
878
Location
OKC
My apologies. Too many suggestions.
I'll be quiet now.

This is your thread/project.
It's looking good!
I wish I had a shop like that.
Congrats!
 
Last edited:

mouthpiece

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
May 15, 2007
Messages
5,354
Reaction score
2,557
Location
Broken Arrow
@-Pjackso i am ok with any thoughts, suggestions or insight. No problems here.
I used the 2 7/8 drill stem with 1/4" wall thickness, not the thinner 3/16" pipe.
This was what people that have built these at 10' spans suggested to be used.
I WENT WITH 8' spans so 20% closer than what others are building chicken truss shops and barns.
I Added cross ties and leg supports and "X" bracing in the trusses. Other don't
Granted I am a bit taller than some but I am hoping it will stay together.
I am thinking about tying into some cemented piers.
The containers are where I was told to put them. I'm Not moving them again since I've already moved them a 2nd time
 

mouthpiece

Sharpshooter
Supporting Member
Special Hen Supporter
Joined
May 15, 2007
Messages
5,354
Reaction score
2,557
Location
Broken Arrow
Awesome pics, and great progress!
Looking good....

BUT - I have concerns about the legs.
I know you welded the pipes to the bottom of the truss so that it'd be taller. (Who wouldn't want a taller shop) But I'm concerned about the pipes.

In short, you have a tall rigid structure (truss system) put on top of small pipes. Any lateral wind load will try to flex the shop - and the pipes (and welds) are what will flex the most. Over years it may fatigue the pipes/welds.

I'm not a shop builder, so I don't know what's generally acceptable for shops this size. Thoughts?

It'll probably be fine, just my passing thoughts.
I am very concerned about the wind and storms we have here and the damage it may cause the structure.
I am thinking of ideas to anchor.
I may temporarilly tie into the nearest container (it weighs 10k lbs)and then pour 6 cement piers and permanently tie in 3 legs on each side of the structure.
 