We have passed EPA phase 1 study, city council and are waiting on the rezoning. The proposed range will have 4 50yard bays 1 100 yard bay and a 300 yard long range. Still waiting on the final drawing!
How come this hasn't been updated or talked about in so long? I was curious if the new range was opened or if a rroadblock has been hit. I was interested in joining also. Thanks.
Enter your email address to join: