https://s3-us-west-1.amazonaws.com/hmt-forum/laying_miles_of_pipe_in_a_ditch_at_once.mp4
What do we have here? Butt fused HDPE pipe, that's much easier to fuse aboveground with a purpose-specific wheeled machine? Then once it's fused and pressure tested, this is how it's dropped into a ditch?
What do we have here? Butt fused HDPE pipe, that's much easier to fuse aboveground with a purpose-specific wheeled machine? Then once it's fused and pressure tested, this is how it's dropped into a ditch?