E2C Hawkeye carrier shot with comms
Night landing with comms
Night landing with comms
So far this week, I have learned how to repair oh craps on heavy machinery.
Repairing a D-9 Dozer idler shaft by adding metal to the shaft holder and line boring it back to hold the bushings. Using brass threaded bolts screwed into the threads to keep from filling the threaded holes is probably an old trick but genius to me.
View attachment 219442
View attachment 219446
View attachment 219447
View attachment 219448
Gouging setting to rapidly remove metal with a flat copper gouging rod.
View attachment 219440
View attachment 219450
View attachment 219451
View attachment 219452
Enter your email address to join: