Greeting all. I have a L1A1 project and in need of a plumber.
New US bbl 9 need gas port drilled, gas block fitted/installed and bbl mount to reciever.
Too close to turn back now, and not willing to give this up.
thanks all.
New US bbl 9 need gas port drilled, gas block fitted/installed and bbl mount to reciever.
Too close to turn back now, and not willing to give this up.
thanks all.